Panels and Power
Wiring
Panels and Breakers
Faults and Symptoms
Inspections
EV Charging
Service Areas
Get in Touch
Resources
Commercial electrical
For a managed portfolio the repair is half the job. The other half is a record showing what was found, what was done and that it was inspected, because that is what gets produced if anyone ever asks.
Records
The test of a maintenance record is whether it survives being handed to somebody else. An owner selling a building, an insurer asking a question, or a new managing agent taking over should all be able to read it without ringing us to explain what it means.
An invoice saying "attended, repaired" fails that test. What was found, what was done, and whether it was inspected is the standard we write to by default, and maintenance plans sets out the same expectation for scheduled visits.
That matters most where an inspection or a certificate is involved, because those documents are what an insurer or a buyer asks for years later. Permits and certificates covers who should end up holding them, which is you rather than us.
Where a portfolio has never had a baseline, one round of electrical safety inspection across the units is the efficient way to get one, and it turns an unknown into a schedule you can budget against.
How it runs
One round across the units turns an unknown into a schedule you can budget against.
Grouped work costs less than scattered visits, and the coordination is ours rather than yours.
Anything needing a long outage lands between tenancies, where access costs nothing and the outage bothers nobody.
Found, done, inspected, written so it survives being handed to an owner or an insurer.
Timing
Access is the hidden cost in managed residential. Arranging entry to an occupied unit costs notice, coordination and sometimes a wasted visit, and none of that appears on a quote. An empty unit costs none of it.
So the heavier work belongs in that window: detection, board work, and anything requiring a longer outage. Smoke and CO detector installation is the item most often left until it is urgent, and it is quick while a unit is empty.
The other candidate is a unit that keeps generating call-outs. Repeated attendance on an ageing service is usually more expensive across a year than replacing it once, and a panel upgrade priced against twelve months of invoices often makes that obvious.
For recurring scheduled work rather than reactive visits, maintenance plans sets out what a defined scope should contain, and how to tell one from a discount arrangement.
Related work
Common questions
Records arrive in a form we can hand straight to an owner. Rare in this trade.
Did the detection and the board between tenancies rather than making us arrange access twice.
One pass across eleven units gave us a budget instead of a guess.
Showed us a year of invoices against one upgrade. Obvious once someone added it up.
From the blog
Next step
One baseline round turns an unknown portfolio into a schedule you can budget against, with records you can hand on.
Records for an owner · Units scheduled together · Empty windows used