Electrical inspections
A permit is not paperwork for its own sake. It is what causes an independent person to look at the work, and the certificate at the end is what a buyer, a lender or an insurer will ask you for years later.
Which work needs one
New circuits, panel changes and anything touching the incoming service need a permit. Like-for-like replacement of a device or a fitting generally does not.
That means a panel upgrade always does, a subpanel always does, and adding a circuit for a car charger always does. Replacing a broken switch does not, and outlet and switch repair is usually outside it.
Permits run $150 to $400 in most places. Figures are example ranges and pricing depends on the jurisdiction and the scope. On our quotes it is a separate line rather than folded into one number, which is the question worth asking of anyone quoting you.
How it runs
Decided by what changes. We tell you before quoting so the number you compare is a complete one.
Its own line rather than folded in, so you can see whether anyone else has included theirs.
Filed before anything starts. Work that gets covered up before it is seen is work that has to be uncovered.
Booked by us and the certificate handed to you rather than filed with us.
The document at the end
Once the work passes, a certificate is issued. That single document is what gets asked for at the least convenient possible moment: during a sale, when changing insurer, or when a lender wants evidence that work was done properly.
Where work was done previously without a permit, that is a different conversation and it starts with an assessment rather than a quote. Code violation correction covers how that runs, and a pre-purchase inspection is what usually surfaces it in the first place.
If you only want to know where you stand before committing to anything, an electrical safety inspection is the cheaper piece of work and produces a list rather than a certificate.
Related work
Common questions
Customer reviews
Permit on its own line. The other two quotes had buried theirs and looked cheaper.
Handed us the document without being asked. Needed it eight months later for the sale.
Booked rough-in inspection before the drywall date rather than after it.
Told us upfront it was permitted work rather than surprising us with a fee later.
From the blog
Next step
We tell you whether your job needs one before quoting, file it before starting, and hand you the certificate at the end.
Named on the quote · Filed before work · Certificate to you