Panels and Power
Wiring
Panels and Breakers
Faults and Symptoms
Inspections
EV Charging
Service Areas
Get in Touch
Resources
Electrical inspections
Nobody can price a correction they have not seen. This work starts with an assessment, then a quote against the specific items, rather than a number invented from a description over the phone.
Two ways people arrive
The first is an inspection that did not pass, and it almost always names a short list of specific items rather than condemning everything.
The second is work done previously without a permit, usually surfacing during a sale. That is a broader assessment, because nobody knows what was done or by whom, and a pre purchase inspection is what normally turns it up. Permits and certificates explains what should have existed.
Either way the first visit produces a list rather than a price. Where the list is long enough that a full picture is needed, an electrical safety inspection at $180 to $320 on most homes is the efficient way to get it.
How it runs
From the inspection report where one exists, or from an assessment where the work was never declared.
Item by item rather than a single figure for the whole house. That is what lets you compare quotes.
Corrections are usually permitted work, so it gets filed rather than quietly fixed.
Presented for inspection and the certificate handed to you, which is what proves it is closed.
What turns up
People expect a catastrophe and usually get a list of unremarkable items. Junctions made without a box, neutrals and grounds bonded in a subpanel, a missing ground path, circuits extended beyond what they were sized for, and protection devices missing where the room requires them.
Each is straightforward to correct once identified. Grounding and bonding covers the two that appear most often, and where the panel itself is on the list breaker panel repair sets out where repair stops being sensible.
Where the underlying cause is old wiring rather than bad workmanship, the conversation changes, and knob and tube replacement or a partial rewire may be the honest answer rather than item-by-item correction.
Related work
Common questions
Worked from the four items on the report rather than requoting the house. Passed on the revisit.
Assessed it first and told us it was ordinary rather than frightening us into a rewire.
Got the corrections and the certificate done inside the closing window.
Explained the neutral and ground issue in plain words instead of quoting code at us.
From the blog
Next step
Send us the report if you have one. We work from the actual items rather than requoting everything.
Assessment first · Priced item by item · Re-inspected and documented