Panels and Power
Wiring
Panels and Breakers
Faults and Symptoms
Inspections
EV Charging
Service Areas
Get in Touch
Resources
Installation · Wiring
Rewiring is priced by how hard it is to reach the wire, not by how much wire there is. Two houses of identical size can differ by half again, and the difference is plaster, finished ceilings and whether there is an attic to work from.
What sets the number
A rewire runs $6 to $15 a square foot, and the spread inside that range is almost entirely about how the house is built. Open framing during a renovation sits at the bottom.
Most whole-house projects land between $10,000 and $30,000. What moves a job up is rarely the wire: it is the number of walls that must be opened and closed again, and whether the existing service can carry the finished circuit count.
Where it cannot, an electrical panel upgrade is part of the scope rather than a surprise later, and where the panel is merely full a subpanel does it for less.
The other half of the estimate is what we find once the first wall is open. Junctions made without a box, circuits that were extended rather than replaced, and grounding that was never continuous are all common in a house old enough to need this work. An electrical safety inspection first turns most of that from a discovery into a line item.
How it runs
Attic, basement, panel and a sample of the walls. Access is what we are measuring, because access is what sets the price.
You get two numbers and what each leaves in place. Nobody should buy a whole-house rewire without knowing what a partial one would have cost.
Work is sequenced room by room. Rough-in has to be inspected before the walls close, so that date drives the order.
Booked by us, certificate to you for your records and your insurer.
Full or partial
Not every house that has old wiring needs all of it replaced. Where the original circuits were partly replaced over the years, the live remainder can be small, and replacing that alone gets you the safety and the insurance outcome without the whole-house price.
That is nearly always the case with knob and tube replacement, where tracing what is still carrying current is the first hour of work and often halves the job. It is also true of aluminum wiring, where pigtailing the connections is frequently enough and a full rewire is the expensive answer to a question nobody asked.
Whichever you choose, the inspection is inside the price. Insurers ask for the certificate rather than for our invoice, so permits and certificates go to you rather than staying in our file.
Related work
The most common reason a rewire gets quoted.
Learn moreUsually has a cheaper answer than a rewire.
Learn moreWhere the finished circuit count exceeds the service.
Learn moreWhen the walls are open anyway, the price drops.
Learn moreCommon questions
Walked the attic before quoting instead of guessing from the floor plan. The number did not move.
Showed us that two thirds of the old wiring was already dead. Saved us most of the estimate.
Coordinated rough-in against the drywall date so nobody was waiting on anybody.
One permit covered both rather than two visits and two inspections.
From the blog
Next step
We walk the house, price the full rewire and the partial one, and put both in writing before anything opens.
Both options priced · Permit and inspection included · Certificate to you