Knob and tube is not automatically dangerous. It becomes a problem when it has been buried in insulation, spliced into without a box, or asked to carry loads it was never built for. Usually what forces the job is an insurer.
Why it is a problem
The original installation was competent for the loads of its day. It has no ground conductor, it relies on air around the conductors to shed heat, and it was designed for lighting and a few outlets. None of that is dangerous on its own.
What makes it dangerous is a century of alterations. Insulation blown into a ceiling removes the air the wiring needs. Junctions made without a box and buried in a wall cannot be inspected.
Modern loads on circuits sized for a lamp are the third. An electrical safety inspection tells you which of the three you have, and thermal imaging finds the connections already running warm.
It also cannot be extended. Adding a circuit to knob and tube is not permitted, so any new work has to be separated from it, which is why a small job sometimes turns into a bigger conversation about whole home rewiring.
How it runs
Not all knob and tube in a house is still connected. We trace what is actually carrying current, because that is what an insurer cares about and what sets the price.
You get the whole-house number and the partial number, with what each one leaves behind stated plainly.
Work is sequenced so you keep power where you need it. Access decides the order more than anything else.
Booked by us. The certificate is what your insurer will ask to see, so it comes to you rather than staying in our file.
Cost, and what forces it
Most people do not call about knob and tube because something went wrong.
Full removal on a detached 1,500 to 2,500 sq ft home runs $12,000 to $20,000, and materially less when walls are already open for a renovation.
Aluminum branch wiring is a different problem people often confuse with this one, and it has a much cheaper answer. If your home has that instead, aluminum wiring replacement sets out what pigtailing does and when it is sufficient.
Where the panel is old too, an electrical panel upgrade is usually scheduled alongside rather than separately, and the permit covers both rather than two visits.
Related work
When partial removal will not settle it.
Learn moreThe other old-wiring problem, with a cheaper answer.
Learn moreUsually scheduled alongside rather than after.
Learn moreFind out what is live before you price anything.
Learn moreCommon questions
Traced what was actually live. Half of it was already dead. The insurer accepted the partial job.
Told us which walls would open before starting. No surprises once they were in.
Ninety day condition on the sale. They scheduled it around the closing date and the certificate arrived in time.
Did the panel at the same time rather than making it a second visit and a second permit.