Panels and Power
Wiring
Panels and Breakers
Faults and Symptoms
Inspections
EV Charging
Service Areas
Get in Touch
Resources
Service area
Most of what we are asked for here is new: a charger, a suite, a shop, a kitchen. All of it comes back to one question the fitting itself never answers, which is whether the service has room for it.
Before the fitting
Running a circuit for a charger, a hot tub or a basement suite is straightforward work.
We do the calculation before quoting rather than on the day. Where there is room, you get the price you expected. Where there is not, you are looking at an electrical panel upgrade or, if the box is merely full rather than the service undersized, a subpanel at a fraction of the cost.
Car charging is the load that most often tips the balance now, and it is also the one with the most room to be clever about. Level 2 charger installation with load management sometimes removes the need for any new capacity at all, because the charger steps back when the rest of the house is busy.
How it runs
Charger, suite, shop, kitchen. The item matters less than the load it represents.
Totals against the demand factors. This is the step that decides whether the job is what you expected or something larger.
Written and itemized, with the permit as its own line, booked against your other trades rather than in isolation.
Inspected while everything is visible, then finished. The certificate comes to you afterwards.
Renovations
On a renovation the electrical date is not really ours, it is the drywall date, because inspection has to happen while everything is still visible. Booking rough-in late is the single most common way an electrical trade delays a build.
That is the time to think about positions rather than fittings. Outlets end up behind furniture, switches on the hinge side of a door, and islands with nothing on them, all because nobody asked where things were going. Outlet and switch installation and pot light layout are both far cheaper decided now than moved later.
Where the new work meets old wiring, the two have to be separated rather than extended. Knob and tube cannot be added to, which does not always mean a full rewire but does mean a conversation before the plan is fixed.
What we do here
Level 2 at home, sized against a real calculation.
Learn moreBooked against the drywall date.
Learn moreWhere the box is full but the service is not.
Learn moreTools, compressor and charger on one feed.
Learn moreCommon questions
Load management meant no upgrade at all. Two other quotes had included one.
Booked rough-in against our drywall date without being chased about it.
Asked where the appliances were going before deciding where the outlets went.
One trench, one subpanel, and room left for what we add next year.
From the blog
Next step
Tell us what you are adding. The load calculation comes before the quote, not after the work starts.
Calculation first · Coordinated with your trades · Permit included